Case Study
Information Systems Integration Challenge
Improvement of 300% on ETL, and 400% on the reporting component
Challenge
- Identification of system weakness highlighting potential break points whilst improving the whole system’s performance
Solution
- Optimization methodology
- Development of Manufacturing Execution Systems
- Integration of systems and applications
- Interface with the plant's plan (machines)
Benefit
- Improvement of more than 300% on the ETL process, through restructuring
- Improvement of 400% of the reporting component, achieved by the optimization of the database and the SQL produced by the application.
Case Studies
-
Information Systems Integration Challenge
Improvement of 300% on ETL, and 400% on the reporting component
-
Production Monitoring System
Design and development of an operational solution for production monitoring and a support solution for real-time decision making
-
SAEE
System for the assembly process monitoring, electrification and medium voltage metal boards testing
